Rig: Beynouna

Name Beynouna
Owner National Drilling Company (NDC)
Manager National Drilling Company (NDC)
Rig Type Jackup
Sub Type Independent Leg Cantilever
Jackup Type Standard
Max Water Depth (ft) 160
Max Drill Depth (ft) 18000
Dimensions (ft) 151 x 156 x 18
Leg Length (ft) 260
Competitive No

Current Location

Country Abu Dhabi (UAE)
Region Middle East

Drilling Equipment

Drawworks Type Mid Continent U-914-EC
Drawworks HP 1400
Mud Pumps Type Continental Emsco FB-1600 Triplex
Top Drive Tesco 500 Ton Hydraulic Portable
Hookload Capacity (lbs) 1000000

Rig Construction Details

Rig Design Baker Marine
Rig Model 160-C
Year Built 1983
Country of Build Brazil
Yard Name Nobara Engenharia Shipyard
Group Yard Name Nobara Sociedade de Mineração Comércio e Indústria Ltda

Rig Contract Details

Operating Status Operational
Operator ZADCO/OPCO

News

9 Apr 2015

Drydocks World completes 'Beynouna' repair

Drydocks World the international service provider to the shipping, maritime, offshore, oil, gas and energy sectors announces the completion of a refurbishment project on the National Drilling Company’s (NDC) offshore drilling Rig Beynouna. Drydocks World’s comprehensive rig services and innovative offshore project management methodology turned around the major repair on Rig Beynouna ahead of schedule in 28 days. Drydocks World has previously completed numerous successful projects for NDC, progressively increasing our strategic alliance over the years. For Rig Beynouna Drydocks World carried out drydocking, hull treatment, crane repairs, HP piping, SW lines cleaning, accommodation repairs and treatment works. The quoted number of days to complete the project was 37, however Drydocks World managed to reduce the quoted repair duration and the project was efficiently completed in only 28 days. A total of 40 tons of steel was used in the 21 various tanks, with the pipe shop renewing all sea water pipes in just 7 days. The efficient completion of work on Rig Beynouna reflects the focused attention and excellent project team support allocated towards this vessel in order to reach the milestone date. The Drydocks World rig division and NDC worked together as an integrated unit in order to ensure quality execution on Rig Beynouna, with excellent management support from both sides. Preparation and planning were key to the successful completion of Rig Beynouna, reflecting Drydocks World and NDC’s commitment to the systematic provision and implementation of stringent HSEQ initiatives. As part of Drydocks World’s incentive program, the top performers were awarded with appreciation gifts from NDC and Drydocks World to recognize their diligent efforts in celebration of excellent delivery on Rig Beynouna. Drydocks World looks forward to working with NDC again and is grateful for their continued faith in our services.

About The Rigs Website

What you are seeing is a selection of sample rig information from the Infield Rigs database. If you would like to see more detailed information regarding the unit, please click here to contact a member of the Infield Rigs Team or call us on +44 207 423 5000

Feedback