Jawhara 05 (SAROST S.A.) (Jackup)

ICON Awarded HelM Wellhead Platform Design and Install Offsore TUNISI

Return to news list

23 December 2013

TOPIC plan to use the jack-up rig, JAWHARA 5 (J-05) (ex- ENSCO 60), which will be converted and upgraded to be capable of both drilling and production activities as a MODPU (Mobile Offshore Drilling & Production Unit).

Source: http://www.iconeng.com.au/news.html


More News for Operator: SAROST S.A.

Sorry , No other news for operator Return to news list