Rig: UMW Naga 5

Name UMW Naga 5
Owner Velesto Energy
Manager Velesto Energy
Rig Type Jackup
Sub Type Independent Leg Cantilever
Jackup Type Premium
Max Water Depth (ft) 400
Max Drill Depth (ft) 30000
Dimensions (ft) 234 x 208 x 25
Leg Length (ft) 517
Competitive Yes

Current Location

Country Malaysia
Region South East Asia

Drilling Equipment

Drawworks Type National Oilwell Varco ADS 10T
Drawworks HP 3000
Mud Pumps Type Lewco W-2215 Triplex
Top Drive National Oilwell Varco TDS-8SA
Hookload Capacity (lbs) 1500000

Rig Construction Details

Rig Design Keppel FELS
Rig Model B Class
Year Built 2014
Country of Build Singapore
Yard Name Pioneer Yard I
Group Yard Name Keppel Offshore & Marine Ltd.

Rig Contract Details

Operating Status Operational
Operator Petronas Carigali Sdn Bhd

News

10 Jul 2014

UMW secures Myanmar contract for 'UMW Naga 5'

UMW OIL & GAS CORPORATION BERHAD (UMW- OG) today announced that its wholly-owned subsidiary UMW Offshore Drilling Sdn Bhd (UOD) has been awarded a contract with PTTEP International Limited (PTTEPI) in relation to the Provision of Drilling Rig Services for Block M-3 Appraisal Drilling Campaign 2014. Block M-3 is located at offshore Myanmar. The contract will be performed using ‘UMW NAGA 5’, its latest jack-up drilling rig, which is currently under a drilling contract in the Philippines with NIDO Petroleum Pty Ltd. (NIDO). The contract is for five firm wells, (approximately 250 days excluding mobilisation and demobilisation), and may be extended for one optional well thereafter and represents a contract value of approximately USD51.3 million for the firm wells. The rig is expected to be mobilized to Myanmar in August.

7 Jul 2014

Nido set to plug Baragatan-1A well

Nido Petroleum Limited (Nido) on behalf of SC 63 Joint Venture partners PNOC-EC and Dragon Oil (Philippines SC 63) Limited wishes to advise that the Baragatan-1A well on the 6th July 2014 had reached a depth of 2,681 meters Measured Depth (2,328 meters TVD sub-sea) having drilled through the primary Pagasa Formation reservoir objective. The primary Pagasa Formation reservoir objective was encountered between 2,534 – 2,654 meters Measured Depth (2,209 – 2,305 meters TVD sub-sea) comprising primarily of limestones of poor to good reservoir quality with minor sandstones and siltstones. Preliminary Logging Whilst Drilling (LWD) log data recorded through this interval indicates the reservoir units to contain low gas saturations (C1 to C5) which did not warrant further evaluation or testing. With respect to the two zones of potential interest encountered in the shallower Pagasa Formation, preliminary evaluation of available LWD data indicates the thin sandstones encountered within the gross interval 1,977 - 2,004 meters Measured Depth (1,785 - 1,805 meters TVD sub-sea) are potentially gas-bearing and the limestone encountered over the gross interval 2,207 – 2,236 meters Measured Depth (1,960 – 1,982 meters TVD sub-sea) contains low gas saturations. Both these intervals did not warrant further evaluation or testing. The forward operation is to Plug and Abandon the Baragatan-1A well.

2 Jul 2014

Nido releases Baragatan-1A well update

Nido Petroleum Limited (Nido) on behalf of SC 63 Joint Venture partners PNOC-EC and Dragon Oil (Philippines SC 63) Limited wishes to advise that the Baragatan-1A well as at 2nd July 2014 was currently at 2,457 meters measured depth (2,152.9 meters TVD sub-sea). Since the previous well update released on the 23rd June 2014, continuing formation pressure and unstable well bore conditions in the e 8 ½” hole section required the setting of the 7” liner at 2,356 meters Measured Depth (2,109 meters TVD sub-sea). Following the successful setting of the 7” liner, stable hole conditions were established although drilling performance has been reduced in the 6” hole section. Current operation was changing the drill-bit before drilling ahead in 6” hole towards the primary reservoir objective.

23 Jun 2014

Nido releases Baragatan-1A well update

Nido Petroleum Limited(Nido) on behalf of SC 63 Joint Venture partners PNOC-EC and Dragon Oil (Philippines SC 63) Limited wishes to advise that the Baragatan-1A well as at 23 June 2014 was preparing to drill ahead in 8 ½ “ hole at 2,329 meters Measured Depth (2,055.9 meters TVD sub-sea). Drilling progress since the 9 5/8” casing point has taken longer than predicted due to slow drilling of the Pagasa Formation claystone and elevated formation pressures. Nido expects to be at the primary reservoir objective in the next few days, based on forward drilling estimates. Nido wishes to further advise that during the drilling of the Pagasa Formation a gross interval from 1,977 - 2,004 meters Measured Depth (1,785 - 1,805 meters TVD sub-sea) comprising mainly sandstone and a gross interval from 2,207 – 2,236 meters Measured Depth (1,960 – 1,982 meters TVD sub-sea) comprising limestone contained elevated mud-log gas readings (C1 to C5) with oil shows recorded in the upper part of the limestone interval. It is unclear as to the significance or otherwise of these mud-log gas shows and this data will be considered for further evaluation once the primary reservoir objective has been drilled and the well has reached its planned Total Depth of 3,164 meters Measured Depth (2,700 meters TVD sub-sea).

27 May 2014

Nido spuds Baragatan-1A

Nido Petroleum Limited (Nido) on behalf of SC 63 Joint Venture partners PNOC-EC and Dragon Oil (SC 63 Philippines) Limited wishes to advise that the Baragatan-1A well was successfully spudded on 25th May 2014. The 30” conductor pipe was run to a depth of 173.3 metres Measured Depth and successfully set across the unstable geological zone. Following the setting of the 30” conductor the well will be drilled to the 13 3/8” casing point around 982 meters Measured Depth (950 meters TVD sub-sea). Nido will provide further progress reports to the market at key casing points during the drilling of the well. The Baragatan-1A well is being drilled using the ‘UMW Naga 5’ jackup.

22 May 2014

'UMW Naga 5' to re-spud Baragatan-1 well

Nido Petroleum (Nido) on behalf of the SC 63 joint venture partners PNOC-EC and Dragon Oil (SC 63 Philippines) has announced that the Bragatan-1 exploration which was spudded on the 15th May 2014 needs to be re-spudded. During the drilling of the 36” top-hole section the well encountered an unexpectedly unstable geological zone which precluded the setting of the 30” conductor pipe at the planned depth of 169.5m measured depth. The forward plan is to move the ‘UMW Naga 5’ rig approximately 100m for the current surface location and re-spud the well. Nido will provide further progress reports to the market at key casing points following the re-spudding of the well.

15 May 2014

Nido spuds Baragatan-1 well

Nido Petroleum Limited (Nido) is pleased to announce on behalf of SC 63 Joint Venture partners PNOC-EC and Dragon Oil (SC 63 Philippines) Limited that the ‘UMW Naga 5’ jack-up rig spudded the Baragatan-1 exploration well in Service Contract 63, offshore the Republic of the Philippines, at approximately 8.00 am WST 15th May 2014. The well, which is being operated by Nido Petroleum Philippines Pty Ltd, is currently drilling ahead in the 36” hole section prior to setting the 30” conductor as planned. Nido will provide further progress reports to the market at key casing points during the drilling of the well.

12 May 2014

'UMW Naga 5' arrives at Philippines drilling location

Nido Petroleum Limited (“Nido” or the “Company”) is pleased to announce on behalf of the Service Contract 63 Joint Venture partners, PNOC-EC and Dragon Oil (Philippines SC 63) Limited, that the ‘UMW Naga 5’ jack-up rig arrived at the Baragatan-1 well location on 12th May 2014 following a ten day tow from Singapore as planned. The forward plan is to move the rig over the Baragatan-1 surface location and complete pre-loading activities ahead of spudding the well later in the week.

5 May 2014

'UMW Naga 5' jackup begins mobilisation to Philippines

Nido Petroleum Limited (Nido) on behalf of the Service Contract 63 (SC 63) joint venture partners; Nido Petroleum Philippines Pty Ltd, PNOC-Exploration Corporation and Dragon Oil Plc, is pleased to announce that the ‘UMW Naga 5’ jackup rig commenced mobilisation from Singapore to the Baragatan location in SC 63, on the 2nd May 2014. The unit commenced its mobilisation to the Philippines drilling location at 6.15pm AEST and Nido will update the market once the rig arrives at its location, which is anticipated to take 12 days.

24 Apr 2014

Nido releases Baragatan-1 well update

Nido Petroleum Limited (Nido) has advised that the first stage of the farm-out process for the company’s interest in Service Contract 63 is currently in process with Dragon Oil Plc. The farm out process involves the transfer of a 40% participating interest in the service contract and has been approved by the Philippines department of energy. Nido has also announced that preparations for the spudding of the Baragatan-1 exploration well are now in the final stages, with drilling set to commence once the ‘UMW Naga 5’ has been mobilised to the well location from Singapore.

18 Dec 2013

Nido Petroleum secure 'UMW Naga 5' jackup for Philippines drilling

Nido Petroleum Limited (Nido) has agreed a contract with UMW Standard Drilling (UMW) to contract UMW’s currently under construction ‘UMW Naga 5’ jackup drilling rig. Nido has contracted the ‘UMW Naga 5’ for a six week period from the beginning of June 2014 for drilling operations in the Philippines, including the drilling of the Baragatan prospect. The ‘UMW Naga 5’ jackup is currently under construction in Singapore and is due to be delivered in early May 2014 after which it will be mobilised to the Philippines for its contract with Nido. When delivered the ‘UMW Naga 5’ will be the fourth jackup rig in UMW’s drilling fleet following the delivery of the ‘UMW Naga 4’ jackup in February 2013 which is currently working in Malaysia for Petronas.

23 May 2013

Standard Drilling sells off last rig

Standard Drilling announced that the company has entered into an agreement to sell the last company's last jackup rig to UMW Oil & Gas of Malaysia. UMW will pay Standard US$223 million for the asset which is still under construction at Keppel FELS in Singapore and due for delivery in Q2 2014, with the transaction expected to be completed on June 10th 2013.